… for dragging loads. Application of GIRs 1 and 6. Adoption : 2021 … 2. Stranded steel cable (wireline) being a 6-strand … for dragging loads. Application of GIRs 1 and 6. Adoption : 2021 …
… boiling point (IBP) 35 °С; final boiling point (FBP) 210 °С; 5 % vol. distilled at 54 °С; 90 % vol. distilled at 180 °C; 96 % vol. distilled at 210 °C. Application of GIRs 1 and 6 (Subheading Note 4 to …
… Chapter 90) and 6. See also Opinion 9027.20/2. Adoption : 2021 Extractor membrane Gas pump Oil pump Power supply … to Chapter 90) and 6. See also Opinion 9027.20/1 Adoption : 2021 …
… of food and beverage preparations. Adoption : 1999 … 21. Vitamin C preparation (500 mg per tablet) put up for … before consumption. Application of GIRs 1 and 6. Adoption : 2021 … 39. Preparation in form of free flowing particles …